| AFI Air Traffic Services Reduced Vertical Separation Minima Course Outline (ICAO 59) |  | |
| AFI ARMA Assessment Forms for Monthly Aircraft Deviations — May 2007 |  |  |
| AFI ATS RVSM Training Guidance Material |  |  |
| AFI GMU Height Monitoring Service |  |  |
| AFI Reduced Vertical Separation Minimum (RVSM) RVSM Safety Policy |  |  |
| AFI Regional Monitoring Agency (ARMA) (Form F3) – Withdrawal of Approval to Operate in RMA RVSM Airspace |  | |
| AFI RVSM Monitoring Agency – Reporting Format |  | |
| AFI RVSM Pre-Implementation Safety Case Core Document – Final Version — February 2008 |  | |
| AFI RVSM Pre-Implementation Safety Case Appendices – Final Version — February 2008 |  | |
| AFI RVSM Programme – Functional Hazard Assessment |  | |
| AFI RVSM Programme Managers/AFI RVSM Task Force Members/AFI RVSM Project Management Team |  | |
| AFI RVSM Strategy/Action Plan for Implementation of Reduced Vertical Separation Minima in the Africa-Indian Ocean Region |  |  |
| | | |
| AFI RVSM Switchover Plan. T –24 ToS T +2 |  |  |
AIC 01/08 Flight Planning Implementation of Reduced Vertical Separation (RVSM) within the Kingdom of Swaziland Airspace — Submission of Flight Plans for flight within RVSM airspace |  | |
| | | |
AIRAC AIP – Supplement S001/08 Faja FIR – (MATSAPHA TMA) Implementation of Reduced Vertical Separation Minima (RVSM) within Swaziland Airspace |  | |
| | | |
| ARPO and ARMA AFI RVSM implementation close down report 20 September 2008 |  | |
| ATC Operations Manual for Implementation of RVSM |  |  |
| Cruising levels as per direction of flight — FL280 to FL430 |  | |
| Final AFI RVSM Approvals (5 June 2008) |  | |
| Guidance Material for Airworthiness and Operational Approval |  |  |
| Handbook for AFI RMA on RVSM Implementation |  |  |
| ICAO Doc 7030 Amendment on RVSM — June 2007 |  |  |
| Implementation of Reduced Vertical Separation Minimum (RVSM) in the Airspaces of Africa and the Ocean Airspaces (AFI Region) |  | |
| | | |
| JAA Temporary Guidance Leaflet (TGL) No. 6 |  |  |
| NLR – AFI RVSM Pre-Implementation Safety Case – Appendices |  | |
| NLR – Pre Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region |  | |
| Pilot RVSM Training – Guidance Material |  | |
| Revised Pre-Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region |  | |
| Revised Pre-Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region – Executive Summary |  | |
| | | |
| Revised Safety Plan for the Implementation of RVSM |  |  |
| RMA F2 – Record of Approval to Operate in RMA RVSM Airspace |  | |
| RVSM Implementation Readiness Assessment Survey: AFI Region |  |  |
| RVSM NSP Validation — Detailed Criteria |  | |
| RVSM Sample NOTAM |  |  |
| Sample Aeronautical Information Circular (AIC/AIP Supplement) |  | |
| Specimen National Plan for Implementation of RVSM |  |  |
| Status of AFI RVSM States Readiness Survey |  |  |
| Template – Letter of Procedure/Letter of Agreement Between |  |  |
| The National Safety Plan Validation Panel (NSPVP) – Comments and Guidance Report |  |  |