|
|
Remonter |
|
|
|
IP01.pdf |
|
|
|
IP02.pdf |
Daily Order of Business and Work Programme
|
|
|
IP03.pdf |
|
|
|
IP04.pdf |
Progress in Implementing 20 NM Surveillance Based Longitudinal Separation
|
|
|
IP05.pdf |
Implementation of Reduced Lateral Separation Minima (RLAT) in the Emirates FIR - UAE
|
|
|
IP06.pdf |
Standardization of Arrival Procedures Based on Traffic Density - Saudi Arabia
|
|
|
PPT09.pdf |
Regional Contingency Planning
|
|
|
PPT10.pdf |
Contingency Event and ESCAT Implementation in Emirates FIR
|
|
|
PPT11.pdf |
Establishing Route Availability Document (RAD) Portal by Saudi Arabia - progress update
|
|
|
PPT25-Egypt-Challenges.pdf |
Cairo FIR Challenges - MID Region Tension-June 2025
|
|
|
PPT25-Egypt-Optimization.pdf |
Cairo FIR Optimization - Phase 3
|
|
|
PPT25-Jordan-Contingency.pdf |
Ensuring Airspace Safety and Resilience in Amman FIR under Regional Conflict
|
|
|
PPT25-Jordan-FIR Updates.pdf |
|
|
|
PPT25-Oman.pdf |
Oman Airspace Strategic Project
|
|
|
PPT25-UAE.pdf |
FUJAIRAH Air Navigation Services - UTM/Drones Application in Fujairah
|
|
|
PPT28.pdf |
Regional Air Navigation Plan New Framework
|
|
|
PPT34.pdf |
Emirates ACC ATFM Unit 2025 Workshop ICAO
|
|
|
PPT42.pdf |
|
|
|
WP01.pdf |
|
|
|
WP02.pdf |
Follow-up on ATM SG/10 and MIDANPIRG/22 Conclusions and Decisions related to ATM/SAR
|
|
|
WP03 .pdf |
Results of MID Air Navigation Report 2024
|
|
|
WP03-App-A.xlsx |
WP03 - Appendix A - ANR 2024-CNS-ATM-SAR
|
|
|
WP04.pdf |
Air Navigation Plan (Vol.I): FIR Boundaries PfA
|
|
|
WP05.pdf |
MID ANP Volume II - Optimization of MID Region ATS Route Designator and related PfA
|
|
|
WP06.pdf |
Preliminary Results of the MID RVSM SMR 2025 - MIDRMA
|
|
|
WP07.pdf |
Air Navigation Plan (Vol.II): Homogenous Areas and Major Traffic Flow
|
|
|
WP08.pdf |
Optimizing Expertise and Resources through Regional Collaboration in ATM - Oman
|
|
|
WP12.pdf |
Channeling Regional Traffic flow
|
|
|
WP13.pdf |
Resilient Operational Navigation Operational Network (RON) - Saudi Arabia
|
|
|
WP14.pdf |
Operational inputs to AIDC-OLDI Applicability Area
|
|
|
WP15.pdf |
|
|
|
WP16.pdf |
ATFM Implementation Progress
|
|
|
WP17.pdf |
MID Region FF-ICE Transition Roadmap
|
|
|
WP18.pdf |
Harmonizing Regional Air Navigation Plans (FF-ICE) - IATA
|
|
|
WP20.pdf |
Need for Regional Guidance on ATM–UTM integration in the MID Region - Oman
|
|
|
WP21.pdf |
Reduction of Longitudinal Separation between FIRs
|
|
|
WP22.pdf |
States National Civil and Military Cooperation Plan
|
|
|
WP23.pdf |
SAR Implementation within the MID Region
|
|
|
WP26.pdf |
Progress on the MID ADS-B Height Monitoring System AHMS - MIDRMA
|
|
|
WP27.pdf |
New ASBU Elements Blocks 0, 1 & 2 relevant to CNS/ATM/SAR
|
|
|
WP29.pdf |
Potential Deficiencies related to ATM/SAR
|
|
|
WP30.pdf |
Air Navigation Deficiencies related to CNS/ATM/SAR
|
|
|
WP31.pdf |
Revision of ToR and Future Work Programme
|
|
|
WP32.pdf |
|
|
|
WP33.pdf |
ATM Monitoring Dashboard - Saudi Arabia
|
|
|
WP38.pdf |
Regional Harmonization of Major Airspace Changes - Saudi Arabia & Oman
|
|
|
WP39.pdf |
Optimized Implementation of Longitudinal Separation Minima in MID Region - Saudi Arabia
|
|
|
WP40.pdf |
Smart Headset Project – Mental Health - UAE
|