Developed and deployed in partnership with France Aviation Civile Services, the Optimizing Airspace for Sustainability (OAS) iPack focuses on structuring an airspace design project and benefiting from the Core PBN Transition. It is tailor-made for States facing concurrent challenges across mixed Terminal Control Areas (TMAs) and Enroute sectors to optimize the organization of their airspace and reduce environmental footprint. Transitioning from ground-based sensor navigation to basic Area Navigation (RNAV) and Required Navigation Performance (RNP) routing offers an immediate, high-impact solution.
By replacing constrained route network with direct, predictable PBN paths, and optimized solutions, States can systematically resolve structural airspace bottlenecks, stabilize air traffic controller (ATCO) workloads, and achieve immediate, quantifiable reductions in noise, fuel consumption and CO2 emissions.
For areas where PBN is not suitable due to GNSS signal operational limitations, or with a significant mix of users' navigation capabilities, other solutions will be considered.
Dedicated subject matter experts will work with the CAA personnel and ATM/OPS/CNS stakeholders in guiding their implementation efforts to achieve the objectives of this iPack. The OAS iPack includes relevant documentation, a workshop, and tools. The level of progress made against each iPack objective depends on the availability of authority’s and stakeholders’ resources to perform the work.
The goal of this iPack is lead CAAs and ANSPs in systematically transitioning a State's airspace infrastructure to a flexible environment and address airspace challenges by building efficient solutions, including combined conventional and PBN solutions, considering new entrants and advanced mobility.
Phase 1 – Airspace Design Workshop | |
| 1 | Identify and address all challenges in relation to an Airspace Design project. |
| 2 | Establish an airspace change project roadmap with all necessary steps to ensure successful implementation. |
| 3 | Develop or update national regulatory roadmaps and operational criteria supporting the transition from conventional navigation to foundational area navigation (RNAV) and required navigation performance (RNP) specifications. |
| 4 | Conduct a comprehensive structural gap analysis of current route network, sectorization and terminal procedures to pinpoint specific track mile inefficiencies and airspace bottlenecks. |
| 5 | Formulate high-level conceptual designs for enroute airspace utilising RNAV 5 specifications to enable shorter, optimised city-pair routing. |
| 6 | Re-engineer terminal airspace structures by designing basic RNAV 1 and RNP 1 arrival and departure tracks to streamline transitions between enroute and approach phases. |
| 7 | Establish basic civil-military coordination frameworks and flexible use of airspace (FUA) structures to unlock conditionally available military airspace for civil tracks. |
| 8 | Formulate a structured safety assessment framework and step-by-step airspace transition plan to mitigate operational risks during the switch from initial airspace structure to optimized and flexible one. |
| 9 | Map and analyse the technical competencies of regulatory inspectors, air traffic controllers, and airspace planners to define necessary training tracks for future operations. |
Phase 2 – Development of a Conceptual Design | |
| 10 | Based on specific challenges highlighted by the beneficiary State, deliver dedicated training to elaborate a Conceptual Design to address these challenges. |
| 11 | Provide assistance and guidance in developing a customized airspace project and conceptual design and building a step-by-step approach towards identified challenges. |
Phase 3 – Development of a Concept of Operations | |
| 12 | Provide assistance and guidance in developing a concept of operations, if applicable. |
The target audience of this iPack comprises personnel from CAAs and ATM, OPS, and CNS stakeholders:
This iPack includes onsite and virtual expert support and onsite workshop delivery.
| Cost: | Phase 1: USD 26,600 plus travel |
| Phase 2: USD 24,600 | |
| Phase 3: USD 29,500 |
Please contact us to estimate the cost for deployment at your location.
The Expressions of Interest Online Form should be submitted on behalf of a State or Regional entity, or industry Organization wishing to obtain more information on iPacks, their benefits and deployment process.