RVSM Documents​

 

RVSM ​Home

​Management of AFI RVSM

Implementation

 

AFI RVSM Program

Office (ARPO)

 

RSVM Communications

RVSM Documents

 

 
 

 

Meetings​ ​ ​
​RVSM/ TF/15 Meeting Report
(Dakar, 12 – 15 May 2009)
​RVSM/RNAV/RNP TF/14 Meeting Report
(Nairobi, 26  – 28 May 2008)
​RVSM/RNAV/RNP TF/13 Meeting Report
(Nairobi, 12  – 14 September 2007)
​Report of the Ninth Meeting of the ATS/AIS SAR Sub-Group (ATS/AIS/SAR/SG/9)
(Dakar, 25  – 27 April 2007)
​RVSM/RNAV/RNP TF/12 Meeting Report
(Dakar, 23  – 24 April 2007)
​2nd AFI RVSM Stakeholders Coordination Meeting (Go/Delay Coordination Meeting) Report
(Dakar, Senegal, 29 – 30 June 2006)
​RVSM/RNAV/RNP TF/11 Meeting Report
(Nairobi, 30 November – 1 December 2006)
RVSM/RNAV/RNP TF/10 Meeting Report
(Dakar, 27 – 28 June 2006)
​RVSM/RNAV/RNP TF/9 Meeting Report
(Nairobi, 19 – 20 April 2006)
​RVSM/RNAV/RNP TF/8 Meeting Report
(Lagos, 11 – 13 October 2005)
​RVSM/RNAV/RNP TF/7 Meeting Report
(Dakar, 8 – 9 August 2005)
​RVSM/RNAV/RNP TF/6 Meeting Report
(Nairobi, 25 – 27 May 2005)
​RVSM Stakeholders Coordination Meeting (Go/Delay Coordination Meeting)
(Dakar, 18 – 19 November 2004)
​RVSM/RNAV/RNP TF/5 Meeting Report
(Dakar, 16 – 17 November 2004)
​RVSM/RNAV/RNP TF/4 Meeting Report
(Lagos, 29 – 30 July 2004)
​RVSM/RNAV/RNP TF/3 Meeting Report
(Nairobi, 22 – 23 April 2004)
​RVSM/RNAV/RNP TF/2 Meeting Report
(Dakar, 19 – 21 November 2003)
​RVSM/RNAV/RNP TF/1 Meeting Report
(Dakar, 17 – 18 June 2002)
​ ​ ​
 
  
Seminars
​AFI RVSM Implementation Safety Seminar (RISS)
(Nairobi, Kenya 19 – 23 April 2010)
Seminar on Search and Rescue and Civil/Military Coordination – Summary of Discussions and Recommendations
(Nairobi, 29 November 2006)
Summary on AFI RVSM Seminar
(Nairobi, 28 November 2006)
​AFI RVSM National Safety Plan (NSP) Seminar/Workshop Summary
(Nairobi, 18 – 22 July 2005)
RVSM (Functional Hazard Analysis Report)
(Johannesburg, 4 – 8 April 2005)
RVSM Seminar
(Lagos, 26 – 28 July 2004)
​RVSM Seminar
(Nairobi, 19 – 21 April 2004)
​ ​ ​
 
  
Reference
AFI Air Traffic Services Reduced Vertical Separation Minima Course Outline (ICAO 59)
​AFI ARMA Assessment Forms for Monthly Aircraft Deviations — May 2007
​AFI ATS RVSM Training Guidance Material
​AFI GMU Height Monitoring Service
​AFI Reduced Vertical Separation Minimum (RVSM) RVSM Safety Policy
AFI Regional Monitoring Agency (ARMA) (Form F3) – Withdrawal of Approval to Operate in RMA RVSM Airspace
​AFI RVSM Monitoring Agency – Reporting Format
AFI RVSM Pre-Implementation Safety Case Core Document – Final Version — February 2008
​AFI RVSM Pre-Implementation Safety Case Appendices – Final Version — February 2008
​AFI RVSM Programme – Functional Hazard Assessment
AFI RVSM Programme Managers/AFI RVSM Task Force Members/AFI RVSM Project Management Team
​AFI RVSM Strategy/Action Plan for Implementation of Reduced Vertical Separation Minima in the Africa-Indian Ocean Region
​AFI RVSM Switchover Plan. T –24 ToS T +2
​AIC 01/08 Flight Planning
Implementation of Reduced Vertical Separation (RVSM) within the Kingdom of Swaziland Airspace — Submission of Flight Plans for flight within RVSM airspace
​AIRAC AIP – Supplement S001/08
Faja FIR – (MATSAPHA TMA)
Implementation of Reduced Vertical Separation Minima (RVSM) within Swaziland Airspace
​ARPO and ARMA AFI RVSM implementation close down report 20 September 2008
​ATC Operations Manual for Implementation of RVSM
Cruising levels as per direction of flight — FL280 to FL430
​Final AFI RVSM Approvals (5 June 2008)
​Guidance Material for Airworthiness and Operational Approval
​Handbook for AFI RMA on RVSM Implementation
​ICAO Doc 7030 Amendment on RVSM — June 2007
​Implementation of Reduced Vertical Separation Minimum (RVSM) in the Airspaces of Africa and the Ocean Airspaces (AFI Region)
​JAA Temporary Guidance Leaflet (TGL) No. 6
​NLR – AFI RVSM Pre-Implementation Safety Case – Appendices
​NLR – Pre Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region
​Pilot RVSM Training – Guidance Material
​Revised Pre-Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region
​Revised Pre-Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region – Executive Summary
​Revised Safety Plan for the Implementation of RVSM
​RMA F2 – Record of Approval to Operate in RMA RVSM Airspace
​RVSM Implementation Readiness Assessment Survey: AFI Region
​RVSM NSP Validation — Detailed Criteria
​RVSM Sample NOTAM
​Sample Aeronautical Information Circular (AIC/AIP Supplement)
​Specimen National Plan for Implementation of RVSM
​Status of AFI RVSM States Readiness Survey
Template – Letter of Procedure/Letter of Agreement Between
​The National Safety Plan Validation Panel (NSPVP) – Comments and Guidance Report
​ ​ ​