Skip Navigation LinksPlanning documents supporting separation reductions and other initiatives:Archives Documents before 2020

  
  
  
  
  
  
  
ADS-B Exclusion List NAT Procedures v-2015-1.pdf
  
ADS-B Exclusion List NAT Procedures v-2015-1 (November 2015)293 KB 2015-11-30 12:00 AMDaly, Catherine30/11/2015 10:10
ASEPS Impl Pln v190628.pdf
  
Implementation Plan and Task List For An Operational Trial Of Advanced Surveillance-Enhanced Procedural Separation (ASEPS) Using Automatic Dependent Surveillance-Broadcast (ADS-B) As approved by NAT SPG/55, June 2019 (C 55/10)658 KB 2019-07-12 12:00 AMCuff, Patricia12-07-2019 09:36
corectedRLatSM Concept_NATSPG48.pdf
  
Updated Concept was approved by the NAT SPG via NAT SPG Conclusion 48/2. Editorial correction made to title of MNPS to PBN Transition Plan for the ICAO NAT Region on 27 July 2012.58 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
CRA_50 NM in NAT MNPS.pdf
  
Collision Risk Assessment of 50 NM Intersecting Track Lateral Separation in North Atlantic MNPS Airspace945 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
ICAO NAT FPL2012 and AIDC Implementation Plan.pdf
  
FPL2012 and AIDC implementation plan185 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
Imp_Plan_10MIN_LongSep_ADS-C_Intersect Tracks_v-1.pdf
  
Implementation Plan for Application of 10 Minute Longitudinal Separation between ADS-C equipped Aircraft operating on Intersecting Tracks in the Reykjavik CTA2401 KB 2016-06-10 12:00 AMDaly, Catherine10/06/2016 08:39
Imp_Plan_25NM_OTS_LatSep_v-1.pdf
  
Implementation Plan for Application of 25NM Lateral Separation between Aircraft operating on NAT Organised Track System (NAT OTS) tracks in the Reykjavik CTA (v-2016-1)2779 KB 2016-06-10 12:00 AMDaly, Catherine10/06/2016 05:47
Imp_Plan_5MIN_LongSep v-1.pdf
  
Implementation Plan for Application of 5 Minute Longitudinal Separation between Aircraft in the Reykjavik CTA 2755 KB 2016-06-10 12:00 AMDaly, Catherine10/06/2016 08:42
Imp_Plans_5MIN_LongSep-23NM LatSep Shanwick CTA 2017.pdf
  
Implementation Plans for Application of 5 Minute Longitudinal Separation on intersecting Tracks and 42.6 km (23 NM) Lateral Separation between appropriately equipped aircraft operation in Shanwick CTA500 KB 2024-06-18 12:00 AMCuff, Patricia18-06-2024 11:21
Impl_Plan_50NM in BIRD MNPS.pdf
  
Implementation Plan for an Operational Trial of Application of 50 NM Lateral Separation in the Reykjavik CTA between MNPS Approved Aircraft on Intersecting and non-Intersecting Tracks - Version 1.11493 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
Impl_Plan_BIRD_GNSS_LatSep.pdf
  
Implementation Plan for Application of GNSS Based Lateral Separation Within the Reykjavik CTA below F285 v0.2 (NAT IMG Dec 46/07 refers-2015)3099 KB 2015-09-22 12:00 AMCuff, Patricia22-09-2015 09:18
LPPO_CONOPS_Jan2015.pdf
  
Concept of Operations for the Application of 30 NM or 50 NM Longitudinal and 30 NM Lateral Separation Minima in Santa Maria Oceanic Control Area (CTA) (NAT IMG Dec 46/08 refers_2015)416 KB 2015-09-22 12:00 AMCuff, Patricia22/09/2015 08:39
LPPO_ImpPlan_Jan2015.pdf
  
Implementation Plan for application of 30 NM or 50 NM longitudinal and 30 NM lateral separation minima in Santa Maria Oceanic CTA1413 KB 2015-09-22 12:00 AMCuff, Patricia22/09/2015 09:03
MNPS to PBN Task List (May 2014).pdf
  
Task List for the Transition from MNPS to PBN (May 2014 - NAT IMG Decision 44/02 refers)287 KB 2014-11-05 12:00 AMSALOMON, Rodolphe05/11/2014 08:12
NAT DLM Task List v2017_1.pdf
  
NAT DLM IMPLEMENTATION PLAN - PHASE 2B TASK LIST (NAT DLM TASK LIST V.2017_1)249 KB 2017-05-26 12:00 AMCuff, Patricia26-05-2017 10:26
NAT DLM Task List v2017_2.pdf
  
NAT DLM IMPLEMENTATION PLAN - PHASE 2B TASK LIST (NAT DLM TASK LIST V.2017_2)250 KB 2018-01-18 12:00 AMCuff, Patricia18-01-2018 06:18
NAT PBCS Impl Plan v2017 _2.pdf
  
NAT Performance Based Communication and Surveillance (NAT PBCS) Implementation Plan (December 2017)296 KB 2017-12-07 12:00 AMDaly, Catherine07-12-2017 09:51
NAT PBCS Impl Plan v2017_1.pdf
  
NAT Performance Based Communication and Surveillance (NAT PBCS) Implementation Plan (May 2017) 336 KB 2017-05-29 12:00 AMCuff, Patricia29-05-2017 06:47
NATIMG41_PPT01-RCP-RSP Intro.pdf
  
Performance based communication and surveillance - Introduction to RCP and RSP. Presented to NAT IMG/41712 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
OWAFS CONOPS v190628.pdf
  
Concept of Operations For The Provision Of Operations Without An Assigned Fixed Speed (OWAFS) In The - approved by NAT SPG/55, June 2019 (C 55/13 refers)405 KB 2019-07-12 12:00 AMCuff, Patricia12-07-2019 09:35
OWAFS Task List v190628.pdf
  
Task List For The Provision Of Operations Without An Assigned Fixed Speed (OWAFS) In The - approved by NAT SPG/55, June 2019 (C 55/13 refers)201 KB 2019-07-12 12:00 AMCuff, Patricia12-07-2019 09:34
RCP_RSP Q_and_A.pdf
  
This document seeks to answer questions which have been posed regarding the application of RCP and RSP. As per NAT IMG Decision 41/10 this document is made available as a reference document.584 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
RLatSM Task List v2017_2.pdf
  
Task List Supporting the Trial Implementation of Reduced Lateral Separation Minima (RLatSM) in the ICAO NAT Region316 KB 2017-12-18 12:00 AMCuff, Patricia18-12-2017 08:31
RLongSM Criteria (June 2012).pdf
  
Success Criteria for the RLongSM Validation Trial as updated at NAT SPG/4884 KB 2014-10-02 12:00 AMSALOMON, Rodolphe02/10/2014 06:13
RLongSM Plan (November 2012).pdf
  
Implemenation Plan for the Trial Application of RLongSM in the NAT Region, as updated at NAT IMG/41290 KB 2014-10-02 12:00 AMSALOMON, Rodolphe02/10/2014 06:12
SASP20 IP09 The RLongSM Concept.pdf
  
SASP-WG/WHL/20 (May 2012) IP/09 - The Reduced Longitudinal Separation Minimum Concept293 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
SASP20 IP10 Long Reich Coll Risk Model.pdf
  
SASP-WG/WHL/20 (May 2012) IP/10 - The Longitudinal Reich Collision Risk Model334 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
SASP20 WP24 Estimating SepLoss Distri.pdf
  
SASP-WG/WHL/20 (May 2012) - WP/24 Estimating the Longitudinal Separation Loss Distribution under Periodic Reporting using Waypoint Reporting Data964 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
SASP20 WP25 Coll Risk Esti under RLongSMin Ops.pdf
  
SASP-WG/WHL/20 (May 2012) - WP/25 Collision Risk Estimates under Reduced Longitudinal Separation Minimum Operations291 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40
SASP21 WP29 RLongSM OpTrial.pdf
  
SASP-WG/WHL/20 (Nov 2012) WP/29 - Longitudinal Collision Risk Estimates under the NAT RLongSM Operational Trial1989 KB 2014-08-25 12:00 AMBrunette, Benoit25/08/2014 06:40