WP/01 | Draft Agenda |  |
WP/02 | Follow up on SAT 22 Cons and Decs |  |
| APPENDIX A - ATM_Status of implementation of SAT 22 Cons AND Decs |  |
| APPENDIX B2 - Follow up Conc. Dec CNS Rev NAV Portugal |  |
WP/03 | Air traffic statistics of the EUR-SAM Corridor 2017_SATMA |  |
WP/04 | Missing Flight Plan |  |
| APPENDIX - Missing Flight Plan |  |
WP/05 | EUR SAM CORRIDOR 2017 RISK ASSESSMENT and LHD_SA |  |
| APPENDIX - EUR SAM CORRIDOR 2017 RISK ASSESSMENT & LHD_SATMA |  |
WP/06 | Flight Level Occupancy in the EUR-SAM Corridor _ 2017_SAT |  |
WP/07 | Implementation of 5 minutes Longitudinal Separation based on PBCS in EUR SAM |  |
WP/08 | Coordination Failures in AORRA Airspace _ATNS |  |
WP/09 | ASECNA _ATM Contingency Plan of SAT Area |  |
| APPENDIX - Draft ATM Contingency Plan in SAT Area _V6 _ASECNA |  |
WP/11 | Performance of SAT CNS Infrastructure and Systems |  |
WP/12 | AMHS |  |
| APPENDIX A - AMHS |  |
| APPENDIX B - AMHS |  |
WP/13 | Follow up AMHS Implementation | |
WP/14 | AMHS link_Casablanca - Lisbon |  |
WP/15 | Follow up AIDC implementation |  |
| APPENDIX A - Follow up AIDC implementation |  |
| APPENDIX B - Follow up AIDC implementation |  |
| APPENDIX C - Follow up AIDC implementation |  |
WP/16 | AIDC Implementation ASECNA |  |
WP/17 | Space-based ADS-B |  |
WP/20 | PBCS IMPLEMENTATION READINESS SOUTH AFRICA _ATNS |  |
WP/21 | PBCS Status AFI |  |
WP/22 | PBCS IMPLEMENTATION IN THE EUR-SAM CORRIDOR AIRSPACE_ENAIRE |  |
| APPENDIX - IMPLEMENTATION IN THE EUR-SAM CORRIDOR AIRSPACE_ENAIRE |  |
WP/23 | Spaced Based ADS-B _AIREON |  |
WP/24 | GADSS AIRCRAFT TRACKING REQUIREMENT_IATA |  |
WP/25 | SAT New structure |  |
INFORMATION PAPERS |
IP/01 | Information Bulletin |  |
IP/02 | List of WPs & IPs |  |
IP/03 | Workprogramme |  |