RVSM Programme

 RVSM Documents

 

 

RVSM Home Management of AFI RVSM AFI RVSM Program RSVM Communications RVSM Documents
Implementation Office (ARPO)
 
 
 

 

Meetings
RVSM/ TF/15 Meeting Report
(Dakar, 12 – 15 May 2009)
RVSM/RNAV/RNP TF/14 Meeting Report
(Nairobi, 26  – 28 May 2008)
RVSM/RNAV/RNP TF/13 Meeting Report
(Nairobi, 12  – 14 September 2007)
Report of the Ninth Meeting of the ATS/AIS SAR Sub-Group (ATS/AIS/SAR/SG/9)
(Dakar, 25  – 27 April 2007)
RVSM/RNAV/RNP TF/12 Meeting Report
(Dakar, 23  – 24 April 2007)
2nd AFI RVSM Stakeholders Coordination Meeting (Go/Delay Coordination Meeting) Report
(Dakar, Senegal, 29 – 30 June 2006)
RVSM/RNAV/RNP TF/11 Meeting Report
(Nairobi, 30 November – 1 December 2006)
RVSM/RNAV/RNP TF/10 Meeting Report
(Dakar, 27 – 28 June 2006)
RVSM/RNAV/RNP TF/9 Meeting Report
(Nairobi, 19 – 20 April 2006)
RVSM/RNAV/RNP TF/8 Meeting Report
(Lagos, 11 – 13 October 2005)
RVSM/RNAV/RNP TF/7 Meeting Report
(Dakar, 8 – 9 August 2005)
RVSM/RNAV/RNP TF/6 Meeting Report
(Nairobi, 25 – 27 May 2005)
RVSM Stakeholders Coordination Meeting (Go/Delay Coordination Meeting)
(Dakar, 18 – 19 November 2004)
RVSM/RNAV/RNP TF/5 Meeting Report
(Dakar, 16 – 17 November 2004)
RVSM/RNAV/RNP TF/4 Meeting Report
(Lagos, 29 – 30 July 2004)
RVSM/RNAV/RNP TF/3 Meeting Report
(Nairobi, 22 – 23 April 2004)
RVSM/RNAV/RNP TF/2 Meeting Report
(Dakar, 19 – 21 November 2003)
RVSM/RNAV/RNP TF/1 Meeting Report
(Dakar, 17 – 18 June 2002)
 
  
Seminars
AFI RVSM Implementation Safety Seminar (RISS)
(Nairobi, Kenya 19 – 23 April 2010)
Seminar on Search and Rescue and Civil/Military Coordination – Summary of Discussions and Recommendations
(Nairobi, 29 November 2006)
Summary on AFI RVSM Seminar
(Nairobi, 28 November 2006)
AFI RVSM National Safety Plan (NSP) Seminar/Workshop Summary
(Nairobi, 18 – 22 July 2005)
RVSM (Functional Hazard Analysis Report)
(Johannesburg, 4 – 8 April 2005)
RVSM Seminar
(Lagos, 26 – 28 July 2004)
RVSM Seminar
(Nairobi, 19 – 21 April 2004)
 
  
Reference
AFI Air Traffic Services Reduced Vertical Separation Minima Course Outline (ICAO 59)
AFI ARMA Assessment Forms for Monthly Aircraft Deviations — May 2007
AFI ATS RVSM Training Guidance Material
AFI GMU Height Monitoring Service
AFI Reduced Vertical Separation Minimum (RVSM) RVSM Safety Policy
AFI Regional Monitoring Agency (ARMA) (Form F3) – Withdrawal of Approval to Operate in RMA RVSM Airspace
AFI RVSM Monitoring Agency – Reporting Format
AFI RVSM Pre-Implementation Safety Case Core Document – Final Version — February 2008
AFI RVSM Pre-Implementation Safety Case Appendices – Final Version — February 2008
AFI RVSM Programme – Functional Hazard Assessment
AFI RVSM Programme Managers/AFI RVSM Task Force Members/AFI RVSM Project Management Team
AFI RVSM Strategy/Action Plan for Implementation of Reduced Vertical Separation Minima in the Africa-Indian Ocean Region
AFI RVSM Switchover Plan. T –24 ToS T +2
AIC 01/08 Flight Planning
Implementation of Reduced Vertical Separation (RVSM) within the Kingdom of Swaziland Airspace — Submission of Flight Plans for flight within RVSM airspace
AIRAC AIP – Supplement S001/08
Faja FIR – (MATSAPHA TMA)
Implementation of Reduced Vertical Separation Minima (RVSM) within Swaziland Airspace
ARPO and ARMA AFI RVSM implementation close down report 20 September 2008
ATC Operations Manual for Implementation of RVSM
Cruising levels as per direction of flight — FL280 to FL430
Final AFI RVSM Approvals (5 June 2008)
Guidance Material for Airworthiness and Operational Approval
Handbook for AFI RMA on RVSM Implementation
ICAO Doc 7030 Amendment on RVSM — June 2007
Implementation of Reduced Vertical Separation Minimum (RVSM) in the Airspaces of Africa and the Ocean Airspaces (AFI Region)
JAA Temporary Guidance Leaflet (TGL) No. 6
NLR – AFI RVSM Pre-Implementation Safety Case – Appendices
NLR – Pre Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region
Pilot RVSM Training – Guidance Material
Revised Pre-Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region
Revised Pre-Implementation Collision Risk Assessment for RVSM in the African Indian Ocean Region – Executive Summary
Revised Safety Plan for the Implementation of RVSM
RMA F2 – Record of Approval to Operate in RMA RVSM Airspace
RVSM Implementation Readiness Assessment Survey: AFI Region
RVSM NSP Validation — Detailed Criteria
RVSM Sample NOTAM
Sample Aeronautical Information Circular (AIC/AIP Supplement)
Specimen National Plan for Implementation of RVSM
Status of AFI RVSM States Readiness Survey
Template – Letter of Procedure/Letter of Agreement Between
The National Safety Plan Validation Panel (NSPVP) – Comments and Guidance Report
 
Connect with us: