​MET/ATM Seminar and Fifteenth Meeting of the Asia/Pacific Air Traffic Flow Management Steering Group (ATFM/SG/15) 

(Bangkok, Thailand, 28 April – 02 May 2025)

  
  
  
  
  
Edit
collapse Type Name : 2025 ATFM/SG/15  ‎(78)
collapse Category : 1-Report ‎(7)
Draft Report ATFMSG15 to be reviewed by the Meeting.pdfDraft Report ATFMSG15 to be reviewed by the Meeting1 May 2025Secretariat 
Appendix A List of Participants.pdf01Appendix A List of Participants1 May 2025Secretariat 
Appendix B List of Papers.pdf02Appendix B List of Papers1 May 2025Secretariat 
Appendix C ATFMSG Terms of Reference.pdf03Appendix C ATFMSG Terms of Reference1 May 2025Secretariat 
Att A Report of the Side Meeting BOBCAT.pdf04Attachment A Report of the Side Meeting BOBCAT1 May 2025Secretariat 
Att B DRAFT Revision of AFTNAMHS-based ICD for ATFM Ver. 2.0.pdf05Attachment B DRAFT Revision of AFTNAMHS-based ICD for ATFM Ver. 2.01 May 2025Secretariat 
Att C TOR for ATFM Concept Ad-Hoc Group_20250501.pdf06Attachment C TOR for ATFM Concept Ad-Hoc Group1 May 2025Secretariat 
collapse Category : 2-General Information ‎(6)
AP012-25-ATM.pdf01Invitation Letter22 January 2025Secretariat 
Agreement and Release of Liability ICAO APAC Parking Garage.pdf02Agreement and Release of Liability ICAO APAC Parking Garage23 January 2025Secretariat 
ATFMSG 15 WP IP Template.docx03ATFMSG 15 WP IP Template23 January 2025Secretariat 
Order of Business Rev.1.pdf04 - Rev.1Order of Business28 April 2025Secretariat 
Order of Discussion.pdf05Order of Discussion28 April 2025Secretariat 
20250429-ATFM-SG15-Group Photo.pdf06ATFM/SG/15 Group Photo30 April 2025Secretariat 
collapse Category : 3-Working Papers ‎(27)
WP01 Provisional Agenda.pdfWP/01 Provisional Agenda21 April 2025Secretariat 
WP02 Related Meetings Outcomes Rev.1.pdfWP/02 - Rev.1Related Meetings Outcomes28 April 2025Secretariat 
WP03 Addressing of Flight Plans and Missing DEP messages.pdfWP/03 Addressing of Flight Plans and Missing DEP messages21 April 2025Secretariat 
WP04 Regional ATFM Implementaion Status Rev1.pdfWP/04 - Rev.1Regional ATFM Implementation Status23 April 2025Secretariat 
WP05 Progress Update from Asia-Pacific Cross-Border Multi-Nodal ATFM Collaboration (AMNAC) Rev.1.pdfWP/05 - Rev.1Progress Update from Asia-Pacific Cross-Border Multi-Nodal ATFM Collaboration (AMNAC)25 April 2025China, Hong Kong China, Singapore, Thailand, CANSO, and IATA 
WP06 Amendments to Asia-Pacific Region AFTN-AMHS-based Interface Control Document for ATFM, Version 2.0.pdfWP/06Amendments to Asia-Pacific Region AFTN/AMHS-based Interface Control Document for ATFM, Version 2.025 April 2025Hong Kong China, Singapore, and Thailand 
WP07 Update On FIXM V4.3 Extension Development for Asia-Pacific Region.pdfWP/07Update On FIXM V4.3 Extension Development for Asia-Pacific Region25 April 2025Hong Kong China, Singapore, and Thailand) 
WP08 Reactivation of BOBCAT related to Kabul Contingency.pdfWP/08Reactivation of BOBCAT related to Kabul Contingency23 April 2025IATA 
WP09 NARAHG Updates.pdfWP/09 NARAHG Updates21 April 2025China, Japan, Republic of Korea 
WP10 Case Study on the Operational Capacity Guidelines linked to Weather Forecasts.pdfWP/10 Case Study on the Operational Capacity Guidelines linked to Weather Forecasts21 April 2025Republic of Korea 
WP11 Case Study on Applying Flow Rate to ATFM Measures.pdfWP/11 Case Study on Applying Flow Rate to ATFM Measures21 April 2025Republic of Korea 
WP12 Incorporating the use of flow rate into the Asia-Pacific ATFM framework.pdfWP/12Incorporating the use of flow rate into the Asia-Pacific ATFM framework21 April 2025China 
WP13 Proposal for a Collaborative Asia-Pacific ATFM Cloud Network (ACN).pdfWP/13 Proposal for a Collaborative Asia-Pacific ATFM Cloud Network (ACN)21 April 2025China 
WP14 Establishment of ATFM Concept Design Ad-Hoc Group.pdfWP/14Establishment of ATFM Concept Design Ad-Hoc Group25 April 2025Hong Kong China, Singapore, Thailand, and CANSO 
WP15 Industry’s Contributions to Regional ATFM.pdfWP/15 Industry’s Contributions to Regional ATFM21 April 2025CANSO 
WP16 Outcomes from the Special Topic Meeting on the Future of Asia-Pacific ATFM.pdfWP/16Outcomes from the Special Topic Meeting on the Future of Asia-Pacific ATFM23 April 2025Hong Kong China, Singapore, Thailand, and CANSO 
WP17 Finalization of APAC Common Swim Information Services.pdfWP/17Finalization of APAC Common Swim Information Services23 April 2025Secretariat for SWIM TF 
WP18 Use of Digital Form for Status and Implementation Progress Report.pdfWP/18Use of Digital Form for Status and Implementation Progress Report21 April 2025Secretariat 
WP19 ICAO Airport and Airspace Capacity Assessment Workshop.pdfWP/19 ICAO Airport and Airspace Capacity Assessment Workshop21 April 2025Secretariat 
WP20 ATFM Points of Contact List.pdfWP/20 ATFM Points of Contact List21 April 2025Secretariat 
WP21 Terms of Reference and Task List.pdfWP/21 Terms of Reference and Task List21 April 2025Secretariat 
WP22 Using Pretactical GDP to solve strategic Slot Non-Compliance.pdfWP/22Using Pretactical GDP to solve strategic Slot Non-Compliance23 April 2025Australia 
WP23 Progress Update on the Development of Regional A-CDM Implementation Monitoring Scheme.pdfWP/23Progress Update on the Development of Regional A-CDM Implementation Monitoring Scheme25 April 2025ATFM/IR/SWG 
WP24 Establishment of a Change Process of FIXM Version for APAC.pdfWP/24Establishment of a Change Process of FIXM Version for APAC Cross-Border Operational ATFM System-to-System Information Exchange in SWIM25 April 2025Hong Kong China, Singapore, and Thailand 
WP25 Harmonization of ATS Procedures with ATFM Provisions to Enhance Efficiency and Effectiveness of ATM.pdfWP/25Harmonization of air traffic services procedures with the provisions of air traffic flow management (ATFM) to enhance efficiency and effectiveness of air traffic management28 April 2025India 
WP26 Benefit of measuring reduced air delays fuel savings and reduction in CO2 emissions.pdfWP/26Benefit of measuring reduced air delays, fuel savings and reduction in CO2  emissions due to implementation of  air traffic flow management (ATFM) and sharing it with stakeholders in achieving operational efficiency; calculations thereof28 April 2025India 
WP27 Challenges in Management of Air Traffic Flow in Delhi FIR due to Restrictions in Kabul FIR.pdfWP/27Challenges in management of air traffic flow in Delhi FIR due to restrictions in Kabul FIR28 April 2025India 
collapse Category : 4-Information Papers ‎(7)
IP01 List of Papers.pdfIP/01 List of Papers1 May 2025Secretariat 
IP02 CTO Trial Update and Seasonal Analysis.pdfIP/02 CTO Trial Update and Seasonal Analysis21 April 2025Japan 
IP03 A-CDM Implementation in Australia.pdfIP/03A-CDM Implementation in Australia21 April 2025Australia 
IP04 Integration of A-CDM into ATFM in Australia.pdfIP/04Integration of A-CDM into ATFM in Australia21 April 2025Australia 
IP05 Cooperation between China and Europe in Airport Collaborative Decision Making.pdfIP/05 Cooperation between China and Europe in Airport Collaborative Decision Making21 April 2025China 
IP06 A-CDM Operations and A-CDM-ATFM Integration.pdfIP/06A-CDM Operations and A-CDM-ATFM Integration28 April 2025Malaysia 
IP07 Airspace Capacity Enhancement Initiatives in Bay of Bengal and Arabian Sea.pdfIP/07Airspace Capacity Enhancement Initiatives in Bay of Bengal and Arabian Sea28 April 2025India 
collapse Category : 5-Presentations ‎(15)
SP01 ATFM New Provisions - ICAO HQ.pdfSP/01ATFM Global Updates - ATFM New Provisions1 May 2025ICAO HQ 
SP02 APAC Cross-Border Multi-Nodal ATFM Collaboration (AMNAC) Progress Update.pdfSP/02APAC Cross-Border Multi-Nodal ATFM Collaboration (AMNAC) Progress Update (WP/05)1 May 2025China, Hong Kong China, Singapore, Thailand, CANSO, and IATA 
SP03 Preparation for BOBCAT Service Resumption.pdfSP/03Preparation for BOBCAT Service Resumption (Flimsy 01)1 May 2025Thailand 
SP04 WP11 Case Studies on applying Flow Rate to ATFM Measures - ROK.pdfSP/04Case Studies on Applying Flow Rate to ATFM Measures (WP/11)1 May 2025Republic of Korea 
SP05 WP12 Incorporating the Use of Flow Rate into the APAC ATFM Framework - China.pdfSP/05Incorporating the Use of Flow Rate into the Asia/Pacific ATFM Framework (WP/12)1 May 2025China 
SP06 WP22 Using Pre-Tactical GDP’s to solve strategic slot non-compliance.pdfSP/06Using Pretactical GDP to Solve Strategic Slot NonCompliance1 May 2025Australia 
SP07 Flimsy 02 Case study on ATFM operations during a contingency situation - Earthquake.pdfSP/07Case study on ATFM operations during a contingency situation - Earthquake (Flimsy 02)1 May 2025Thailand 
SP08 IP04 Integration of Airport Collaborative Decision Making A-CDM into ATFM in Australia.pdfSP/08 Integration of A-CDM into ATFM in Australia (IP/04)1 May 2025Australia 
SP09 WP16 Outcomes from the Special Topic Meeting on the Future of Asia-Pacific ATFM.pdfSP/09Outcomes from the Special Topic Meeting on the Future of Asia-Pacific ATFM (WP/16)01 May 2024Hong Kong China, Singapore, Thailand, and CANSO 
SP10 WP10 Operational Capacity Guidelines linked to Weather Forecast.pdfSP/10Operational Capacity Guidelines linked to Weather Forecast (WP/10)1 May 2025Republic of Korea 
SP11 WP27 Challenges in Management of Air Traffic Flow in Delhi FIR due to Restrictions in Kabul FIR.pdfSP/11Challenges in Management of Air Traffic Flow in Delhi FIR due to Restrictions in Kabul FIR (WP/27)1 May 2025Australia 
SP12 WP25 Harmonization of ATS procedures with ATFM provisions to enhance efficiency and effectiveness of ATM.pdfSP/12Harmonization of Air Traffic Services Procedures with the Provisions of Air Traffic Flow Management (ATFM) to Enhance Efficiency and Effectiveness of Air Traffic Management (WP/25)1 May 2025India 
SP13 IP05 Cooperation between China and Europe in Airport Collaborative Decision Making.pdfSP/13Cooperation between China and Europe in Airport Collaborative Decision Making (IP/05)1 May 2025China 
SP14 WP13 Collaborative ACN Uniting Asia-Pacific Skies.pdfSP/14Proposal for a Collaborative Asia-Pacific ATFM Cloud Network (ACN) (WP/13)1 May 2025China 
SP15 WP23 Update on Development of Regional ACDM Implementation Monitoring Scheme.pdfSP/15Progress Update on the Development of Regional A-CDM Implementation Monitoring Scheme (WP/23)01 May 2024ATFM/IR/SWG 
collapse Category : Flimsies ‎(1)
Flimsy 03 MET-ATM Seminar Report.pdfFlimsy 03MET/ATM Seminar Report1 May 2025Secretariat 
collapse Category : MET/ATM Seminar ‎(15)
2025 MET-ATM Seminar Program.pdfMET/ATM Seminar Program25 April 2025Secretariat 
20250428-MET-ATM-Seminar-Group Photo.pdfMET/ATM Seminar Group Photo30 April 2025Secretariat 
SP01 15 Years of Progress - Can We Do Better – IFATCA.pdfSP/01 15 Years of Progress - Can We Do Better29 April 2025IFATCA 
SP02 ATM and ATFM requirements for MET information – ICAO.pdfSP/02ATM and ATFM requirements for MET information29 April 2025ICAO 
SP03 Updates on ICAO MET information services development – Chair METR WG and ICAO.pdfSP/03Updates on ICAO MET information services development29 April 2025Chair MET/R WG and ICAO 
SP04 Impact-based MET information to support ATM operation – Japan.pdfSP/04Impact-based MET information to support ATM operation29 April 2025Japan 
SP05 Airport Collaborative Decision-Making (A-CDM) – Australia.pdfSP/05Airport Collaborative Decision-Making (A-CDM)29 April 2025Australia 
SP06 Forecast of runway headwind changes for supporting estimation of Airport Acceptance Rate - Hong Kong China.pdfSP/06Case study: Probabilistic forecast of runway headwind changes for supporting estimation of Airport Acceptance Rate29 April 2025Hong Kong China 
SP07 Case study MET information being used for ATFM – Republic of Korea.pdfSP/07Case study: MET information being used for ATFM29 April 2025Republic of Korea 
SP08 Case study Use of Meteorology Information in Bangkok ATFMU - Thailand.pdfSP/08Case study: Use of Meteorology Information in Bangkok ATFMU 29 April 2025Thailand 
SP09 Case study The development of user-centric engagement strategies and fitfor-purpose products.pdfSP/09Case study: The development of user-centric engagement strategies and fitfor-purpose products in south-west China29 April 2025China 
SP10 Importance of special air reports – Chair METR WG and ICAO.pdfSP/10Importance of special air reports 29 April 2025Chair MET/R WG and ICAO 
SP11 Turbulence Aware - Facilitating industry shift to data-driven turbulence mitigation – IATA.pdfSP/11Turbulence Aware - Facilitating industry shift to data-driven turbulence mitigation29 April 2025IATA 
SP12 En-route turbulence detection using ADS-B data and special air reports – Hong Kong, China.pdfSP/12Case study: En-route turbulence detection using ADS-B data and special air reports29 April 2025Hong Kong, China 
SP13 Temporal and spatial characteristics of aircraft turbulence and turbulence forecasting system.pdfSP/13Case study: Temporal and spatial characteristics of aircraft turbulence on Qinghai-Tibet Plateau slope and turbulence forecasting system based on EDR29 April 2025China 

For further information please contact:

Mr. Manjunath Krishna Nelli

Mr. Anony TC Chui 


Connect with us: