Skip Navigation Links2016 ADS-B SITF15

Edit
collapse Type Name : 2016 ADS-B SITF15 ‎(47)
collapse Category : 1-Report ‎(1)
Final Report of ADS-B SITF15.pdfReport of ADS-B SITF/15Final Report of ADS-B SITF1528 Apr. 2016Secretariat 
collapse Category : 2-General Information ‎(5)
AP026-16-CNS.pdfLetter of InvitationAP026-16-CNS12 Feb. 2016Secretariat 
WP-IP template.docxWP/IP TemplateWP-IP template22 Mar. 2016Secretariat 
Tentative Meeting programme.pdfTentative Meeting ProgrammeTentative Meeting programme18 Apr. 2016Secretariat 
group photo ADSB SITF15.pdfGroup photogroup photo ADSB SITF1519 Apr. 2016Secretariat 
ATT. 1 - Final List of participants.pdfList of participants (for verification by participants, if any)ATT. 1 - Final List of participants22 Apr. 2016Secretariat 
collapse Category : 3-Working Papers ‎(9)
WP01 - ICAO Provisional Agenda ADS-B SITF-15.pdfWP/01Provisional AgendaWP01 - ICAO Provisional Agenda ADS-B SITF-1512 Feb. 2016Secretariat 
WP02_ICAO AI.2 - Outcome of APANPIRG26 on ADS-B.pdfWP/02Review Outcome of APANPIRG/26 on ADS-BWP02_ICAO AI.2 - Outcome of APANPIRG26 on ADS-B30 Mar. 2016Secretariat 
WP03_ICAO AI. 2 - Review Report SEABOB WG11.pdfWP/03Review Report of the Eleventh Meeting of South-East Asia Bay of Bengal Sub-regional ADS-B Implementation Working Group (SEA/BOB ADS-B WG/11)WP03_ICAO AI. 2 - Review Report SEABOB WG1131 Mar. 2016Secretariat 
WP04_ICAO AI.3 - Review Outstanding Action Items.pdfWP/04Review Outstanding Action Items of the Task ForceWP04_ICAO AI.3 - Review Outstanding Action Items07 Apr. 2016Secretariat 
WP05_ICAO AI.6 - TOR and ADS-B Related Conclusions.pdfWP/05Review ADS-B SITF TOR and Works Done by the Task ForceWP05_ICAO AI.6 - TOR and ADS-B Related Conclusions08 Apr. 2016Secretariat 
WP06_AUS AI.4 - Incorrect processing 260B final.pdfWP/06Incorrect Processing of DO-260B Downlinks by Non DO-260B Upgraded Ground StationsWP06_AUS AI.4 - Incorrect processing 260B final11 Apr. 2016Australia 
WP07_AUS AI.4 - International flights post Feb 2017.pdfWP/07IFR Flights to Australia post February 2017WP07_AUS AI.4 - International flights post Feb 201711 Apr. 2016Australia 
WP08_HKG AI.4 - Acquisition of Mode 3A Code Via Mode S Downlink for DO-260 Aircraft.pdfWP/08Acquisition of Mode 3/A Code Via Mode S Downlink for DO-260 AircraftWP08_HKG AI.4 - Acquisition of Mode 3A Code Via Mode S Downlink for DO-260 Aircraft15 Apr. 2016Hong Kong, China 
WP09_MAL AI.2 - Revised Survey on Common Paramaters Monitored for ADS-B Operation v4.pdfWP/09ADS-B Monitoring System: A Survey on Common Items/Parameters Monitored (Rev. 19/04/16)WP09_MAL AI.2 - Revised Survey on Common Paramaters Monitored for ADS-B Operation v419 Apr. 2016Malaysia 
collapse Category : 4-Information Papers ‎(32)
IP01_ICAO Meeting Bulletin.pdfIP/01Meeting BulletinIP01_ICAO Meeting Bulletin12 Feb. 2016Secretariat 
IP02_ICAO AI.5 - ADS-B planning in the eANP.pdfIP/02E-ANP Status and ADS-B Planning in E-ANPIP02_ICAO AI.5 - ADS-B planning in the eANP07 Apr. 2016Secretariat 
IP03_AUS AI.4 - Update on ATC Survillance.pdfIP/03Update on ATC Surveillance Activities in AustraliaIP03_AUS AI.4 - Update on ATC Survillance11 Apr. 2016Australia 
IP04_AUS AI.4 - Selected level transponder data.pdfIP/04“Selected level” Transponder DataIP04_AUS AI.4 - Selected level transponder data11 Apr. 2016Australia 
IP05_AUS AI.4 - Boeing 787 ADS-B Deficiency Update.pdfIP/05Boeing 787 ADS-B Deficiency UpdateIP05_AUS AI.4 - Boeing 787 ADS-B Deficiency Update11 Apr. 2016Australia (with contribution from Boeing) 
IP06_AUS AI.4 - Australian Plan to Decommission some Radars.pdfIP/06Australian Plans to Decommission some RadarsIP06_AUS AI.4 - Australian Plan to Decommission some Radars11 Apr. 2016Australia 
IP07_Lao AI.4 - ADS-B implementation plan in Lao.pdfIP/07ADS-B Implementation Plan of Lao PDRIP07_Lao AI.4 - ADS-B implementation plan in Lao12 Apr. 2016Lao PDR 
IP08_USA AI.4 - ADS-B Avionics Performance Report-2.pdfIP/08U.S. Avionics Performance Report (Rev. 19/04/16)IP08_USA AI.4 - ADS-B Avionics Performance Report-219 Apr. 2016USA 
IP08_USA ADS-B Avionics Performance Report rev2.pdfIP/08U.S. Avionics Performance Report (Revised 02/08/16)IP08_USA ADS-B Avionics Performance Report rev202 Aug. 2016USA 
IP09_USA AI.4 - Revised ADS-B Implem Status v3.pdfIP/09Status of ADS-B Implementation in the U.S. (Rev. 18/04/16)IP09_USA AI.4 - Revised ADS-B Implem Status v318 Apr. 2016USA 
IP10_USA AI. 4 - Perf of ADS-B V2 systems.pdfIP/10Performance of Current ADS-B Version 2 SystemsIP10_USA AI. 4 - Perf of ADS-B V2 systems14 Apr. 2016USA 
IP11_USA AI.4 - AC 90-114A CHG 1 Review.pdfIP/11FAA  Advisory Circular (AC) 90-114A CHG1 and ADS-B Preflight Availability PredictionIP11_USA AI.4 - AC 90-114A CHG 1 Review14 Apr. 2016USA 
IP12_USA AI.4 - Avionics Monitoring.pdfIP/12U.S. ADS-B Equipage Monitoring and Post-installation Performance Issues (Rev. 20/04/16)IP12_USA AI.4 - Avionics Monitoring20 Apr. 2016USA 
IP13_USA AI.4 - Exemption 12555.pdfIP/13U.S. Federal Aviation Administration Exemption 12555 Applicability and ProcessIP13_USA AI.4 - Exemption 1255514/04/16USA 
IP14_VNN AI.4 - ADS-B Implementation.pdfIP/14ADS-B Implementation Progress in Viet NamIP14_VNN AI.4 - ADS-B Implementation14/04/16Viet Nam 
IP15_AUS AI.4 - ADS-B failure in A330.pdfIP/15ADS-B Failures in certain A330 AircraftIP15_AUS AI.4 - ADS-B failure in A33014 Apr. 2016Australia 
IP16_BNG AI.4 - MLAT ADS-B Implementation Plan.pdfIP/16ADS-B and MLAT Implementation Plan in BangladeshIP16_BNG AI.4 - MLAT ADS-B Implementation Plan14 Apr. 2016Bangladesh 
IP17_NZ AI.4 - Airways NZ ADS-B Procurement Process.pdfIP/17ADSB Procurement ProcessIP17_NZ AI.4 - Airways NZ ADS-B Procurement Process14 Apr. 2016New Zealand 
IP18_NZ AI.4 - Proposed ADS-B Implementation.pdfIP/18Implementation of ADS-B in the New Zealand Flight Information RegionIP18_NZ AI.4 - Proposed ADS-B Implementation14 Apr. 2016New Zealand 
IP19_JPN AI.9 - Activities of DAPS.pdfIP/19The Evaluation Activities of DAPs in JapanIP19_JPN AI.9 - Activities of DAPS14 Apr. 2016Japan 
IP20_ROK AI.4 - Operation Plan of ADS-B and UAT in ROK.pdfIP/20The Operation Plan of ADS-B and UAT in the Republic of KoreaIP20_ROK AI.4 - Operation Plan of ADS-B and UAT in ROK14 Apr. 2016Republic of Korea 
IP21_NZ AI.4 - Benefit of trialing ADS-B equipment.pdfIP/21The Benefits of Trialing ADS-B Equipment Suppliers Prior to Signing a National ContractIP21_NZ AI.4 - Benefit of trialing ADS-B equipment14 Apr. 2016New Zealand 
IP22_Rockwell AI.4 - ADS-B Out.pdfIP/22ADS-B OutIP22_Rockwell AI.4 - ADS-B Out14 Apr. 2016Rockwell Collins 
IP23_SIN AI.4 - ADS-B Collaborative in South China Sea Region.pdfIP/23ADS-B Collaboration in South China Sea RegionIP23_SIN AI.4 - ADS-B Collaborative in South China Sea Region18 Apr. 2016Singapore 
IP24_SIN AI.4 - Equipage status of aircraft.pdfIP/24Equipage Status of AircraftIP24_SIN AI.4 - Equipage status of aircraft18 Apr. 2016Singapore 
IP25_IDN AI.4 - ADS-B Implementation in Indonesia.pdfIP/25ADS-B Implementation in Indonesia for ATS Surveillance Separation (Tier-1)IP25_IDN AI.4 - ADS-B Implementation in Indonesia18 Apr. 2016Indonesia 
IP26_MNG AI.4 - Current status of ADS-B Implementation.pdfIP/26Current Status of ADS-B ImplementationIP26_MNG AI.4 - Current status of ADS-B Implementation18 Apr. 2016Mongolia 
IP27_MDV AI.4 - ADS-B Implementation in Maldives.pdfIP/27ADS-B Implementation in the MaldivesIP27_MDV AI.4 - ADS-B Implementation in Maldives18 Apr. 2016Maldives 
IP28_SIN AI.4 - Safety case for ADS-B under Radar environment.pdfIP/28Safety Case for ADS-B under Radar EnvironmentIP28_SIN AI.4 - Safety case for ADS-B under Radar environment18 Apr. 2016Singapore 
IP29_Airbus AI.4 - Presentation from Airbus V.1.pdfIP/29ADS-B OutIP29_Airbus AI.4 - Presentation from Airbus V.118 Apr. 2016Airbus 
IP30_Boeing AI.4 - A Boeing perspective.pdfIP/30A Boeing PerspectiveIP30_Boeing AI.4 - A Boeing perspective19 Apr. 2016Boeing 
IP31_China AI.4 - Update on ADS-B activities in China-Rev.pdfIP/31Update on ADS-B Activities in ChinaIP31_China AI.4 - Update on ADS-B activities in China-Rev19 Apr. 2016China