State

France

FIR

Bordeaux

Location Indicator

LFBB

Region

EURNAT

Status

Accepting NEW

Solution Provided

Upgraded FDPS

Point of contact

Mr Olivier TEYSSAN DIER, Operational follow-up of future ATM En-Route Tools & Concepts, DSNA

ANSP to ANSP Testing

Expected Readiness for testing
with CFMU 120901

Company in charge to update the FPL system

 

FIR Map

 

Internal Testing

 

Milestones

Accepting New FPL

New FPL accepted

Accepting NEW

Other information

The DSNA National Flight Plan processing system (main front end
client of CFMU/IFPS) should be ready 2 or 3 months prior to the
implementation deadline of 15 November 2012. DSNA should take
part in the CFMU OPT2 test session. The impacts on other affected
DSNA systems such as FPL filing systems (notably encompassing
purely VFR FPLs), as well as their corresponding interfaces, have been
identified. Specifications have been drafted (based on CFMU
Interface Manual CFMU 2012_V1_1) and disseminated to
contracted manufacturers of various systems. Some extra complexity for interfaces of French systems outside the IFPS Zone (e.g. Caribbean). Will participate in all OPT sessions with gradually expanding list of systems and roles to play.  See IFPS for IFR FPL's.

web-LAT

284082.331127

web-LONG

5871277.174321

MAP

MYCODE 5871277.174321,284082.331127

User testing

 

Attachments

Created at 05/11/2013 11:09 AM by Hu, Susan
Last modified at 05/11/2013 1:23 PM by Hu, Susan