Third Meeting of the Central Atlantic FIR Satellite Network (CAFSAT) Management Committee (CNMC/3)

​(Dakar, Senegal, 15-16 July 2013)

DOCUMENTATION

WORKING PAPERS
 

​WP
No.
​Agenda
Item No.
​Title
​1 ​- ​Provisional Agenda and Work Programme
​2 ​1 ​Follow up on CNMC/2 Conclusions and Decisions
​3A 2​ ​Review the performance of CAFSAT earth stations and the operational statistics of availability for supported links
​3B ​2 ​Lisbon and Santa Maria CAFSAT stations availability
​4 3​ ​Planning, implementation and operation of very small aperture terminal (VSAT) networks in the AFI Region
​5A ​4 Interconnection and interoperability of CAFSAT with its neighboring
networks (AFISNET, REDDIG)
​5B ​4 ​CAFSAT in ICAO Aviation System Block Upgrades (ASBU) context
​6A ​5 ​Resolution 154 (COM6/24)- WRC-12 and challenges for the safe operation of AFISNET in the 3 400-4 200 C-band
6A
AppA​
​Report ITU-R M.2109
Sharing studies between IMT-Advanced systems and geostationary satellite networks in the fixed-satellite service in the 3 400-4 200 and 4 500-4 800 MHz frequency bands

​6A

AppA2

​Report ITU-R S.2199 (11/2010)
Studies on compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band

6A

AppB​

​Recommendation 724 (WRC-07)
Use by civil aviation of frequency allocations on a primary basis to the fixed-satellite service

​6A

AppC

​Resolution 154–(COM6/24)-WRC-12
Consideration of technical and regulatory actions in order to support existing and future operation of fixed-satellite service earth stations within the band 3 400-4 200 MHz, as an aid to the safe operation of aircraft and reliable distribution of meteorological information in some countries in Region 1
​6B ​4 ​Preparation of WRC-15
6C​ 4​ ​Preparation of WRC-15: Undertaken Ongoing and Future Actions

6C

App​

​Technical and regulatory measures to ensure a long-term spectrum availability and protection for very small aperture terminal operated by aeronautical networks

7​ ​6 ​CAFSAT Modernization and Re-engineering
​8 7​ ​Review of CNMC Terms of Reference

​8

App

​Terms of Reference of the CAFSAT Network Management Committee (CNMC)
​9 ​6 ​CAFSAT Modernization and Re-engineering
​10 ​3 ​Communication Navigation, Surveillance
11 ​1 ​Luanda CAFSAT Station Implementation Project
​Performance Data Collection Form (PDCF)
 
INFORMATION PAPERS

 

 

​IP
No.
​Agenda
Item No.
​Title
​1 ​- Information Bulletin
​2 ​- ​Tentative Work-programme
​3 ​- ​List of Working and Information papers

 


 
 
For further information please contact:
Connect with us: