The Twelfth Meeting of the FANS Implementation Team, Bay of Bengal
(FIT-BOB/12) and the Second Meeting of the Bay of Bengal Reduced
Horizontal Separation Implementation Task Force (BOB-RHS/TF/2)
 
Bangkok, Thailand, 22− 26 February 2010
  
  
  
collapse Type Name :  ‎(1)
collapse Category : 1-Report ‎(1)
FITBOB12_BOBRHS_TF2rpt.pdfReport of the Twelfth Meeting of the FANS Implementation Team for Bay of Bengal (FIT-BOB/12) and the Second Meeting of the Bay of Bengal Reduced Horizontal Separation Implementation Task Force (BOB-RHS/TF/2)
collapse Type Name : BOB-RHS/TF/2 ‎(14)
collapse Category : 3-Working Papers ‎(12)
wp01.pdfWP/01Provisional Agenda - BOB-RHS/TF/2
wp02.pdfWP/02Update BOB-RHS/TF Task List (Revised 16/02/2010)
wp03.pdfWP/03Summary of Outcomes of the BOB-RHS/TF/1 Meeting
wp04.pdfWP/04Letters of Agreement on 50NM Longitudinal Separation
wp05.pdfWP/05RNAV RNP10 Longitudinal Separation
wp06.pdfWP/06Additional ATS Routes to be considered for RNAV RNP10 (50NM) Longitudinal Operations (Revised 16/02/2010)
wp07.pdfWP/07Initial Observations on the Impact of Reduced Longitudinal Separation (RLS0 in the Kabul FIR
WP08.pdfWP/08India’s Progress towards Implementation of BOB-RHS
wp09.pdfWP/09Improving Efficiency on High Volume Routes with the Implementation of Reduced Longitudinal Separation
wp10.pdfWP/10Reduced Horizontal Separation on RNAV Routes between Indonesia and Singapore
wp11.pdfWP/11Data Collection to provide Business Case Supporting Reduced Horizontal Separation Decisions
wp12.pdfWP/12BOBCAT Data Collection and Analysis
collapse Category : 4-Information Papers ‎(2)
ip01.pdfIP/1List of Working Papers (WPs) and Information Papers (IPs)
ip03.pdfIP/3Uni-directional Crossing Routes
collapse Type Name : FITBOB/12 ‎(18)
collapse Category : 3-Working Papers ‎(7)
fitbob_WP01.pdfWP/1Provisional Agenda - FIT-BOB/12
fitbob_WP02.pdfWP/2Review of the Data Link Seminar in 2009
fitbob_WP03.pdfWP/3Update ADS/CPDLC Status and Capacity Enhancements Tables
fitbob_WP04.pdfWP/4Update FIT-BOB Task List WP/1
fitbob_WP05.pdfWP/5Progress Report of ADS-C/CPDLC Trial Operation in the Ujung Pandang FIR
fitbob_WP06.pdfWP/6Terms of Reference for FIT-BOB CRA
fitbob_WP07.pdfWP/7Global Operational Data Link Document
collapse Category : 4-Information Papers ‎(9)
fitbob_ip01.pdfIP/1List of Working and Information Papers
fitbob_ip02.pdfIP/2FANS 1/A Implementation Team for the Bay of Bengal (FIT-BOB) Terms of Reference
fitbob_ip03.pdfIP/3Outcomes of APANPIRG/20
fitbob_ip04.pdfIP/4Outcomes of RASMAG/12
fitbob_ip05.pdfIP/5Summary Reports of the FANS Implementation Team, South-East Asia (FIT-SEA)
fitbob_ip06.pdfIP/6ADS/CPDLC Trial Progress in the Kuala Lumpur FIR over the Bay of Bengal Area (Revised 19/02/2010)
fitbob_ip07.pdfIP/7ADS-C and CPDLC Trials in Male’ (Maldives) FIR
fitbob_ip08.pdfIP/8Datalink Environment of the Bay of Bengal and Arabian Sea
fitbob_ip09.pdfIP/9Report on CPDLC/ADS-C Bench Testing with Chennai and Mumbai Centers
collapse Category : 6-Flimsy ‎(2)
fitbob_flimsy1.pdfFlimsy No.1
fitbob_wp.docWP - Example ( Ms Word Format )

For further information please contact: